Another week of progress!
All the doors and windows are now in place.
The French doors leading out on to the front deck along with all the rectangular, quarter-round and semi-circular glass on that gable wall have been installed.
The semi-circular window in the upstairs master bedroom is in.
As is the one in the attic/storage area over the garage.
The big deck has been finished (except for the railings) and the little entry way deck has been framed out (not pictured).
Even the garage doors have been hung, although one will have to be replaced due to damage in shipping.
Don has also laid out all the plates for the first floor framing and the heating guys have made great strides in installing the radiant floor heat for the first floor. The control panel for that unit is a work of art and will be featured in a future post. (It looks very space age and will probably require a Black Seal to operate! Actually, Ken, the installer, assures me that it won’t take more than a couple of hours of instruction.)
No comments: